Equinor and TechnipFMC · Subsea installation

Åsgard Subsea Compression: every procedure rehearsed before the first offshore day

ROVs working around a yellow subsea compressor station in the simulator

The challenge

The Åsgard compressor is the world's largest and most complex subsea installation, at 300 metres depth with poor visibility and light. Many crew members had not worked in the subsea environment for some time, and mistakes are not an option. Every operator needed to be ready before going offshore.

What OSC delivered

  • An integrated digital twin of the bridge, control room, two ROVs and crane in one environment
  • Every offshore procedure rehearsed step by step by the contractor's operators
  • Crews who had lost familiarity with the seabed regained their confidence
  • Dome visualisation and VR for spatial awareness a briefing room cannot give
Trainees at ROV and crane stations during a session
Diagram of the Åsgard subsea compression station
A yellow subsea structure lifted from a vessel
ROV beside the compressor structure
Crew ready

Full readiness confirmed before the first offshore day

Seabed familiarity

Restored through simulator training

€20M per day

Realised from the Åsgard Subsea Compression project, in Equinor's words

"We at Equinor, Ocean Installer, and Axtech got exactly what we needed and feel fully prepared for the 2025 Compressor Replacement with Normand Vision and MRS."
Morten Person, System Lead, Åsgard Subsea Compression Project, Equinor